This project is a rehabilitation and reconstruction of the Abuja-Kaduna-Zaria-Kano dual carriageway, which has a length of about 380km. The work includes four lanes – two lanes (2x 3.65m) each way, an outer shoulder of 2.75m and improvement of existing cross section, median and side embankments.
PrimeTech’s Infrastructure and Structural teams are currently providing major design supports for the pedestrian bridges, drainages, culvert extension as well as culvert drainage management for the project.

