This is the construction of a two-way traffic carriageway of 2 x 3.65 (7.30)m road pavement, 2.75m outer shoulders, with bridges across the Opobo channel route.

PrimeTech’s Infrastructure Department designed the road from KM 0+000 to 4+100. It also designed the various dewatering solutions and support services for the various gas pipeline protection works.

Its Structural Department designed five 3-span mini concrete bridges on cased bored piles, and also designed oil and gas pipeline crossings with all health and safety protocols.

TypeInfrastructureClientThe Federal Government of Nigeria & Nigeria LNG Ltd.Duration2014 to dateLocationRivers State, NigeriaShare